The downtown section of Bridgewater continues to present problems for motorists.
Because of infrastructure upgrades, traffic is being disrupted at the York St. / Alexandra Ave. / Dufferin St. intersection.
The work will continue until Friday and motorists are advised to use an alternate route.
King Street will remain open to two-way traffic.
Dufferin Street will remain closed from King Street access.
All businesses and residences in the construction-area will continue to be accessible by local-traffic.
The downtown section of Bridgewater continues to present problems for motorists.
Because of infrastructure upgrades, traffic is being disrupted at the York St. / Alexandra Ave. / Dufferin St. intersection.
The work will continue until Friday and motorists are advised to use an alternate route.
King Street will remain open to two-way traffic.
Dufferin Street will remain closed from King Street access.
All businesses and residences in the construction-area will continue to be accessible by local-traffic.
Do you have a news tip?
Submit to NSNews@radioabl.ca.
Bridgewater, CA
1:35 am,
May 17, 2026
L: 10°
H: 11°
Feels like 10°C | °F°
scattered clouds



